ZeroPoint

Launch

Open to a room that already knows who you are.

Who it is for

A new site, shop, venue or venture with an opening date in the diary — usually an owner who has spent everything on the fit-out and nothing on being found.

The trigger

  • A first site opening
  • A second or third location
  • A new venture under an existing name
  • A relaunch after a refit

The problem

Most independents open on a Tuesday and hope the street notices. The money has gone into the room, the kit and the stock, and the opening itself gets a poster and a post the night before. The first month is the cheapest attention a business will ever get, and it is usually the month that gets planned last.

What changes

  • An identity that looks like the business you actually built, not the budget you had left over
  • An opening treated as an event with a reason to turn up, not an announcement
  • Photography and film shot on the day, so the first month of content exists before you need it
  • A baseline recorded on day one, so month three can be compared to something

How it runs

  1. 01

    Discover

    A session on the business, the room, the offer and the street it sits on.

  2. 02

    Position

    What the opening is actually for, and what would count as it having worked.

  3. 03

    Build

    Identity, print, menu or signage, and whatever the opening physically needs.

  4. 04

    Prepare

    The run-up: campaign assets, the page people are sent to, the day planned as an event.

  5. 05

    Open

    We are there on the day. Filming, shooting, running the moment.

  6. 06

    Measure

    Baseline captured, tracked links in place, first report against it.

Scope and investment

We scope this per project rather than from a price list.

A launch for a single site and one for a small group are different jobs, and pricing them the same would mean overcharging one of them. Tell us what is happening and we will come back with a scope and a number — usually within one working day.

Questions we get

How far ahead do you need to start?
Six to eight weeks before opening is comfortable. Four is possible. Under three and we are producing rather than planning, which costs you the identity work.
Do you actually attend the opening?
Yes. That is the part most studios subcontract or skip, and it is the part that produces everything you use afterwards.
What if we already have a logo?
Then we audit it rather than replace it. If it holds up we build around it and spend the budget elsewhere.

Open to a room that already knows who you are.

Start a launch project